A PPAP Level 3 submission for a die casting is 18 elements: one page you sign, the sample parts, and sixteen documents describing how those parts were made. Nine are written by the die caster, four arrive from the customer, four are joint, and one is an outside laboratory’s accreditation.
The nine that are ours are also the nine a reviewer opens first. A submission is an argument that the process which made sample five will still be making the same part at 30,000.
What a PPAP Level 3 submission actually contains
Level 3 means the part submission warrant (PSW), sample parts, and the complete supporting data — all 18 elements, not a selection. It is the default level because it is the first one where a reviewer can see the process rather than a signed page.
The elements and the five level definitions come from the AIAG PPAP manual, fourth edition, published with APQP, FMEA, MSA and SPC as AIAG’s quality core tools. The purpose stated there is narrow: show that the process can reproduce conforming product at the quoted rate.
The route from tool trial to signed warrant is on our PPAP process walkthrough; this page stays with the documents.
Why a die casting needs a PPAP at all
A casting cannot be inspected into confidence, because the defects that matter sit inside the wall and the process that produced them drifts.
A machined bracket can be gauged at 100% and shipped. A 2 mm wall with a cold shut that never reached the surface passes every dimensional check you own, and X-ray finds it only if the sample includes that part — which is why ASTM E505 judges against reference radiographs rather than an absolute limit. Meanwhile the die wears and a fresh alloy break moves fluidity enough to change where the flow fronts meet.
So the customer buys process evidence: flow diagram, PFMEA, control plan, capability. That chain, read in order, is the submission. The system behind it is what our quality control process covers, and what an auditor asks for if the pack is ever challenged.
Level 1 to 5: what changes, and why Level 3 is the default
The levels change how much evidence travels with the warrant. The acceptance criteria stay put: a Level 1 approval and a Level 5 approval mean the same thing about the part.
| Level | What is submitted | When it is chosen | What it leaves out |
|---|---|---|---|
| 1 | PSW, plus an appearance approval report for visible surfaces | Mature part, unchanged process | Everything that shows the process |
| 2 | PSW, samples, limited supporting data | Part derived closely from one already approved | Full layout, initial process studies |
| 3 | PSW, samples, complete supporting data | New part, new die, new plant, significant change | Nothing the manual requires |
| 4 | PSW plus the element list the customer writes | Customer has its own submission standard | Any element not on that list |
| 5 | PSW, samples, full data reviewed at the supplier’s plant | Customer wants to watch the process run | Nothing, but it costs a visit |
Level 4 catches suppliers. The customer defines the list, and a supplier who submits its standard pack against a six-element list has failed to read the requirement. German customers run the same review against VDA 2, published by the VDA Quality Management Center alongside the VDA 6.3 audit they will also schedule.
The 18 elements, and who actually produces each one
Nine are ours, four the customer’s, four joint, one the lab’s: the split that decides who chases whom. Late packs fail on elements nobody realised they owned.
| # | Element | Produced by | What has to be in the binder |
|---|---|---|---|
| 1 | Design records | Customer | Drawing and model at the released revision, plus the ballooned copy |
| 2 | Engineering change documents | Joint | Every change notice between quote and run, closed or deferred in writing |
| 3 | Customer engineering approval | Customer | Written approval wherever the part deviates from the customer’s standard |
| 4 | Design FMEA | Customer | Our input limited to casting failure modes: porosity, draft, wall transition |
| 5 | Process flow diagram | Die caster | Ingot to packed part, including outsourced heat treat, coating and impregnation |
| 6 | Process FMEA | Die caster | Scored against the flow, with die wear, thermal drift and gas porosity as failure modes |
| 7 | Control plan | Die caster | Same numbering as the PFMEA, with sample size, frequency and reaction plan |
| 8 | Measurement system analysis | Die caster | A gauge study for every gauge named in the control plan, fixtures included |
| 9 | Dimensional results | Die caster | Ballooned layout with actual values, from parts out of the production run |
| 10 | Material and performance tests | Joint | Chemistry, tensile, metallography and leak data with the sample source declared |
| 11 | Initial process studies | Die caster | Capability on the characteristics the customer flagged |
| 12 | Qualified laboratory documentation | Test lab | Accreditation scope covering each test performed outside our lab |
| 13 | Appearance approval report | Joint | Grain, colour or class A surfaces, against a signed boundary sample |
| 14 | Sample production parts | Die caster | Parts from the significant production run, every cavity represented |
| 15 | Master sample | Joint | Signed, dated and sealed by both sides, and kept by both |
| 16 | Checking aids | Die caster | Fixtures, gauges and limit samples, each with its own study |
| 17 | Customer-specific requirements | Customer | The customer’s checklist, answered item by item |
| 18 | Part submission warrant | Die caster | The signed claim, with run date and drawing revision |

The three that come back most often are 9, 11 and the link between 6 and 7: dimensional reports fail on datum and revision, capability studies on sampling, PFMEA when its failure modes never appear in the control plan.
The design record is the quiet one. If the revision in the binder is not the one the customer released, every document built on it inherits the error.
How to build the dimensional report a reviewer will accept
A dimensional report passes review when every balloon on the drawing has a line, measured from the datum scheme the drawing states, on parts from the production run.
Start with the ballooned drawing: every dimension, tolerance frame and numeric note gets a balloon in a fixed order, and the report follows that order. A report that reorders dimensions to suit the CMM program reads as one assembled after the fact. On a part like a drive motor housing, where four bearing bores are controlled to each other across 300 mm, the datum order is the measurement: change it and the same part passes or fails.
Report actual values and deviations, never only PASS. State whether the part was measured free or restrained, because on a battery tray that line decides the result. Give true position as a diameter and profile as min and max. Keep uncertainty under a tenth of the tolerance band; on a ±0.05 mm machined feature that leaves little room, so some characteristics belong on a gauge.
As-cast tolerances follow ISO 8062-3 grades, so name the grade the report was measured against; cast and machined tolerances are two different inspection plans. Our note on dimensional tolerance in millimetres sets out how a drawing separates them.

What material and performance results have to show
Chemistry, tensile properties and metallography are the results a customer is most likely to re-test, so each report says where the sample came from and which lot it represents.
Chemistry comes from a spectrometer reading per melt, reported as actual percentages against the range, not as a pass. Name the alloy the drawing names: ADC12 and A383 are close enough to be treated as equivalent, which is why relabelling one as the other on a certificate is a finding rather than a convenience.
Tensile data hides one question: whether the bar was cast separately or cut from the part. Both are legitimate; only one describes the casting. Declare it, and heat treat the bar with the part. Report yield, ultimate and elongation, and name the temper.
Metallography should state the section location and rate porosity against the ASTM E505 reference radiographs, because a number without a location is not repeatable. Leak results need the customer’s test specification — pressure, hold time, limit — since a casting that passes at 0.3 bar may fail at 1.0 bar once the bore is machined and the cut opens porosity.
Outsourced steps carry their own paperwork: heat treat certificates, coating thickness and salt spray, impregnation records, and all of it has to appear on the process flow diagram. A sub-supplier missing from the flow is missing from the PFMEA.
Where capability and MSA studies fail
Most Level 3 rejections come from studies that cannot be defended: the wrong sample, cavities mixed into one distribution, or a gauge that cannot see the tolerance it is judging.
A capability study needs consecutive parts from one production run, unsorted, with the process in its shipping state; thirty is the usual floor for the calculation to mean anything. Ppk comes from that study, Cpk from ongoing data; mixing the two in one table is a quiet way to lose credibility.
Stratify by cavity before computing anything. Two cavities sitting 0.06 mm apart produce a bimodal histogram, and the combined standard deviation punishes a process that is stable in each cavity. Report per cavity, or report the worst one and say so. One-sided characteristics such as flatness need one-sided treatment; inventing a lower limit produces a number that means nothing. The definitions sit in the NIST/SEMATECH chapter on process capability.
Our commitment is Cpk ≥ 1.33 on key characteristics and 1.67 on safety-related ones, on 30 consecutive parts. That is a claim about the process, so it fails the moment the sample is hand-picked.
Every gauge in the control plan needs a study, fixtures and attribute checks included. The usual bands are under 10% of tolerance for acceptance, 10–30% conditional, above 30% a rejected gauge. The trap is scale: a CMM with 0.01 mm repeatability judging a ±0.05 mm bore leaves little margin for operator, fixture or temperature.
How many parts to run before you submit
Run at least 300 consecutive parts on production tooling at production cycle time, and take the samples from that run; thirty bench-built parts are a prototype.
The run has to reach thermal steady state before the counted parts start, which on a 2,500 t cell means scrapping the first shots while the die comes up. It uses the production die, machine, operator and quoted cycle, and a two-cavity die needs both cavities in the dimensional layout.
Five sample parts is a workable minimum, drawn at random from that run; one becomes the master sample, signed by both sides. A run-at-rate demonstration is a separate exercise at target cycle over a full shift, usually the same week, so plan the pack and the capacity run as one event.
Pre-submission checklist
Ten checks catch almost every Level 3 pack that comes back.
- The revision on the layout, the PSW and the customer’s release is the same string.
- Every balloon has a report line, and no line says “typical” without a value.
- The datum scheme matches the drawing, and the report says if the part was restrained.
- Capability studies are split by cavity and taken from consecutive parts.
- Every control-plan characteristic has a gauge study behind it.
- Test bars declare cast-separately or excised, and which heat treat cycle they saw.
- Outsourced processes appear on the flow diagram with certificates attached.
- The outside lab’s accreditation scope covers each test it signed.
- The master sample is signed, dated and stored on both sides.
- The PSW is signed by someone with authority, and its date matches the run.
If any one of the ten cannot be answered, the pack is not late yet; it becomes late when a reviewer finds the gap three weeks on and the run has to be repeated.
Frequently Asked Questions
Does a Level 3 pack need a Cpk study on every dimension?
No. Capability belongs on the characteristics the control plan flags and the customer names, four to eight features on a typical housing. The full layout covers every dimension once.
Can we submit before the die is production-hardened?
No: the warrant claims production, and a die still being spotted is not in its shipping state. If parts are needed earlier, take an interim approval with open items written down, then submit fully after the die work.
Who signs the PSW?
The supplier’s authorised representative signs and the customer acknowledges. The signature states that the samples came from the process described, at the revision and on the date stated. Signing without those facts is signing for someone else’s run.
How long does a Level 3 submission take to prepare?
Two to four weeks after the run if the PFMEA, control plan and gauge studies were built during tool trials. Six weeks or more if they are written afterwards to match existing parts, because every inconsistency then has to be reconciled by hand.
The pack is a statement about a process, and it reads as one. A submission that arrives complete and wrong costs more than one that arrives a week late and honest, because the first has to be withdrawn after the customer has planned around it.